Precision HVAC Installation for Brisbane Hospital Computer Room
Project Overview
This project involved the installation of two Computer Room Air Conditioning (CRAC) units and one chilled water high-wall unit to provide precision cooling for the computer room at Brisbane Hospital. These systems are critical for maintaining the optimal temperature and humidity required for sensitive IT equipment, ensuring uninterrupted hospital operations.
Key Features of the Installation
CRAC Units for Precision Cooling
Two advanced CRAC units were installed to deliver highly accurate temperature and humidity control, tailored to the unique demands of the computer room environment.
Chilled Water High-Wall Unit
This unit was installed to provide supplemental cooling, ensuring redundancy and improved system efficiency.
Energy-Efficient Design
The installed systems feature cutting-edge technology to minimize energy consumption while delivering consistent performance.
Integrated Monitoring
All units are equipped with remote monitoring and alert capabilities to detect and respond to temperature fluctuations in real-time.
Timely Installation
The installation of the CRAC units and chilled water high-wall unit was completed within the specified timeline, ensuring minimal downtime for the hospital's critical IT services.
Challenges and Solutions
Challenge: Limited space in the computer room for large HVAC installations.some text
- Solution: Compact, wall-mounted designs and precise planning ensured efficient use of space without compromising airflow or accessibility.
Challenge: Minimizing disruption to hospital IT services during installation.some text
- Solution: Installation was carefully scheduled during off-peak hours, with temporary cooling measures in place to maintain the server room’s operational environment.
Challenge: Complex ducting and piping around the computer room's infrastructure.some text
- Solution: Expert engineering teams navigated tight spaces with custom installation and precise fittings to ensure seamless integration with existing systems.
Project outcome
The new cooling system provides Brisbane Hospital’s computer room with reliable, high-performance climate control, safeguarding critical IT infrastructure. The dual CRAC units and chilled water high-wall unit work together to maintain temperature and humidity stability, ensuring uninterrupted service delivery.